English | English www.zhitov.ru Free service calculation of building materials

Calculation of the base plate material


drawing scale 1:
Sizes are indicated in centimeters. Specify the dimensions of the base plate
dimensions of the basement
Overall height of the foundation plate, including the underground part.

Panel height B
Length Y
Width X

Formwork

Dimensions is in millimeters. The thickness of the boards for formwork
Value is in meters. Length of the board
Dimensions is in millimeters. The width of the board
Composition of concrete

The required amount of cement for the manufacture of one cubic meter of concrete different in each case.
It depends on the brand of cement, desirable brand received concrete, the size and proportions of the fillers.
Indicated in bags of 50 kg.
Cement per cubic meter of concrete
Proportions of concrete by weight
Cement : sand : Macadam

: :

Armature Specify the height, width, the cell and the number of horizontal levels.
If the calculation of the valves you don't need, then leave the field blank, the number of series.
Armature

Sizes are indicated in centimeters. Cell height
Sizes are indicated in centimeters. Cell width
Dimensions are in millimeters. Diameter, mm
The number of horizontal rows of bars.
If you do not require reinforcement calculation, then leave this field blank.
Number of rows
The cost can be quoted in any currency. Enter the cost of building materials

Cement (50 kgs per bag)
sand (for 1 ton)
Macadam (for 1 ton)
Bulletin (for 1 cubic meter)
Armature (for 1 ton)

Help

One type of foundation is a monolithic melkozaglublennogo baseplate.
Normally, such a foundation is a monolithic concrete slab, which is located under the entire area of the house.
For the perception of no deformation stresses in the foundation plate necessarily apply spatial reinforcement throughout.
Their device requires a larger flow of concrete and reinforcement as compared with traditional foundations, and therefore more expensive.

That help calculate this program?

Volume of concrete to fill the plate.
Required amount of materials for making concrete - cement, sand, gravel.
The number of boards needed for the device casing.
Estimated cost of construction materials.
Reinforcement of the foundation slab depends on the geological conditions and design.


(1901)
© 2007 - 2012
русский | Russian Afrikaans | Afrikaans العربية | Arabic Беларуская | Belarusian български | Bulgarian català | Catalan česky | Czech Cymraeg | Welsh dansk | Danish Deutsch | German ελληνική | Greek English | English español | Spanish eesti | Estonian فارسی | Persian suomi | Finnish français | French Gaeilge | Irish galego | Galician עברית | Hebrew हिन्दी | Hindi hrvatski | Croatian magyar | Hungarian Indonesia | Indonesian íslenska | Icelandic italiano | Italian 日本語 | Japanese 한국어 | Korean lietuvių | Lithuanian latviešu | Latvian македонски | Macedonian Melayu | Malay Malti | Maltese Nederlands | Dutch norsk | Norwegian polski | Polish português | Portuguese română | Romanian slovenčina | Slovak slovenščina | Slovenian shqipe | Albanian српски | Serbian svenska | Swedish Kiswahili | Swahili าษาไทย | Thai Filipino | Filipino Türkçe | Turkish українська | Ukrainian Việt | Vietnamese ייִדיש | Yiddish (简体) | Chinese (Simplified) (繁體) | Chinese (Traditional) հայերեն | Armenian Azərbaycan | Azerbaijani საქართველოს | Georgian Kreyòl Ayisyen | Haitian creole বাঙ্গালী | Bengali Hmoob | Hmong Daw తెలుగు | Telugu Euskal | Basque Latin | Latin Esperanto | Esperanto