English | English www.zhitov.ru Free service calculation of building materials

Calculation of the material strip foundation


drawing scale 1:
Specify the type of foundation

Type 1
Type 2
Type 3
Type 4



Sizes are indicated in centimeters.
Dimensions X and Y - axis of the foundation.

dimensions of the basement
Specify the dimensions of the basement

Medium to the right axis C
Width A
Full height basement, including the underground part.

Foundation height B
Height Y
Length X

Armature

Number of rows of fixtures to be placed along the foundation. Number of rows of fixtures
Vertical reinforcement rods that connect the horizontal rows.
Indicated in centimeters.
Vertical bars, every
rods set at pieces
Diameter of reinforcement
Formwork

Dimensions is in millimeters. The thickness of the boards for formwork
Value is in meters. Length of the board
Dimensions is in millimeters. The width of the board
Please read the help. Composition of concrete

The required amount of cement for the manufacture of one cubic meter of concrete different in each case.
It depends on the brand of cement, desirable brand received concrete, the size and proportions of the fillers.
Indicated in bags of 50 kg.
Cement per cubic meter of concrete
Proportions of concrete by weight
Cement : sand : Macadam

: :

The cost can be quoted in any currency. Enter the cost of building materials

Cement (50 kgs per bag)
sand (for 1 ton)
Macadam (for 1 ton)
Bulletin (for 1 cubic meter)
Armature (for 1 ton)

Help

It is not necessary to repeat how important the design of the house to calculate the amount of building materials for the foundation of the house.
Because the cost of a monolithic foundation comes to the third value of the house.

This service will facilitate the planning and calculation of the basement at home. Help calculate the amount of concrete, reinforcement, shuttering boards for the device strip foundation.

What can you learn:

Footprint of the foundation (For example, to determine the amount of waterproofing to cover the finished basement)
Amount of concrete for the foundation and floor slabs or pouring a basement floor (here will be fun, when, due to elementary errors in multiplication is not enough concrete)
Reinforcement - the number of valves, automatic calculation of weight based on its length and diameter
The area of ​​the formwork and the amount of timber in cubic meters and in pieces
The area of ​​all surfaces (for the calculation of waterproofing the basement) and lateral surfaces and base
Added calculation of the cost of building materials of the foundation.

The same program will draw a blueprint of the foundation.
I hope the service will be useful to those who are building the foundation of their hands, and professionals-builders.

Composition of concrete

Proportion and amount of cement, sand and gravel for making concrete are given the default reference, as recommended by manufacturers of cement.
Just as the price of cement, sand, gravel.

However, the composition of concrete is strongly dependent on the size fractions of crushed stone or gravel, cement brand, its "freshness" and storage conditions. It is known that prolonged storage of cement loses its properties, and high humidity of cement quality is deteriorating rapidly.

Please note that the cost of sand and gravel is specified in the program for 1 ton. Vendors also announced a price per cubic meter of sand, crushed stone or gravel.

Proportion of sand depends on its origin. For example, river sand is heavier than a career.
1 cubic meter of sand weighs 1200-1700 kg on average - 1500 kg.

With gravel and rubble difficult. According to various sources, the weight of 1 cubic meter from 1200 to 2500 kg depending on size. Heavier - more than fine.

So count the cost per ton of sand and gravel you may need to refine or vendors.

However, the calculation still helps to know the estimated costs for building materials for filling the basement. Do not forget another wire for knitting fittings, nails or screws for the casing, the delivery of construction materials, the cost of excavation and construction work.


(1901)
© 2007 - 2012
русский | Russian Afrikaans | Afrikaans العربية | Arabic Беларуская | Belarusian български | Bulgarian català | Catalan česky | Czech Cymraeg | Welsh dansk | Danish Deutsch | German ελληνική | Greek English | English español | Spanish eesti | Estonian فارسی | Persian suomi | Finnish français | French Gaeilge | Irish galego | Galician עברית | Hebrew हिन्दी | Hindi hrvatski | Croatian magyar | Hungarian Indonesia | Indonesian íslenska | Icelandic italiano | Italian 日本語 | Japanese 한국어 | Korean lietuvių | Lithuanian latviešu | Latvian македонски | Macedonian Melayu | Malay Malti | Maltese Nederlands | Dutch norsk | Norwegian polski | Polish português | Portuguese română | Romanian slovenčina | Slovak slovenščina | Slovenian shqipe | Albanian српски | Serbian svenska | Swedish Kiswahili | Swahili าษาไทย | Thai Filipino | Filipino Türkçe | Turkish українська | Ukrainian Việt | Vietnamese ייִדיש | Yiddish (简体) | Chinese (Simplified) (繁體) | Chinese (Traditional) հայերեն | Armenian Azərbaycan | Azerbaijani საქართველოს | Georgian Kreyòl Ayisyen | Haitian creole বাঙ্গালী | Bengali Hmoob | Hmong Daw తెలుగు | Telugu Euskal | Basque Latin | Latin Esperanto | Esperanto